Skip to content
SPS///LINEAR TELEMETRYSTRINGPOTSENSOR.COM

ENGINEERING DOCUMENTS / CONFIGURATION RELEASE

String pot calibration, drawings & CAD requests.

Define the evidence you need before committing to a sensor. Match the drawing, electrical specification and measurement record to the quoted configuration.

Request model-specific documents →

Five documents that answer different engineering questions

CAD and test records are issued for a defined configuration and revision. Public download files are listed only after that association is verified. Use the request below for the exact files needed by your project.

DocumentWhat to reviewRelease basis
2D mounting drawingHousing envelope, hole centers/threads, cable exit, fitting and connector clearanceExact RFQ reference and drawing revision
3D STEP envelopeAssembly fit, mounting orientation, cable path and reserved travelReleased model, units, revision and representation limits
Electrical specificationElement resistance or active circuit, supply limits, output load and pin scheduleSelected output and termination; not a generic color chart
Linearity / calibration recordSerial number, reference, positions, readings, error method and uncertaintyAgreed measurement scope and traceability requirement
Itemized quotationSensor / kit, accessories, quantity, setup, documentation and delivery scopeConfiguration, destination and commercial acceptance

MECHANICAL FIT

Ask for the envelope before detailed assembly work

Give the original model, mounting plane and available space. Compare hole coordinates, thread forms, cable axis, eye fitting and connector clearance. A STEP envelope helps check interference, but its visual resemblance does not establish electrical or dynamic equivalence.

  • Specify inches first and identify any metric dimensions on the installation.
  • Request the released drawing revision and verify the file units in your CAD system.
  • Include full-extension and return positions, cable routing and mechanical reserve.

Define the linearity test before comparing percentages

You can attach the original-model label, mounting drawing or STEP envelope to the RFQ below. Identify the revision and units; files are sent with your request to the SPS inquiry mailbox.

A useful request states the working span, acceptance limit and error definition. Independent linearity, end-point linearity and system error are different quantities; a percentage without its method is incomplete.

Planning stepInformation to include in the requested report
IdentifySensor serial number, configuration, drawing revision, resistance / output and supply.
ReferenceReference equipment, calibration status, method, temperature and mounting orientation.
MeasureAgreed stroke positions; 0%, 25%, 50%, 75%, 100% is one possible planning grid, not an issued test result.
RepeatExtension / retraction readings and repeat runs where hysteresis or repeatability matters.
EvaluateReference line, FS definition, deviations, uncertainty, acceptance decision and responsible reviewer.

Request traceability as a measurement requirement

Traceability concerns a measurement result and the documented calibration chain behind it. When your laboratory requires traceability, specify the reference, uncertainty and report scope in the RFQ. NIST does not endorse SPS products, and no NIST approval is claimed here. Read NIST’s traceability policy and FAQ.

Specify immersion and cable cycling separately

For a wet installation, include depth, time, fluid and connector conditions, then add the cable motion and contamination profile. Housing ingress evidence and dynamic mud / water cycling answer different questions. State the acceptance conditions you need in the released record.

YOUR CONFIGURATION → ENGINEERING REVIEW

Request a matched drawing & itemized quote

Send the same specification by form or your own email client. Engineering will confirm the build, document revision and availability.

1. Define the sensor and installation
2. Complete the measurement chain

Indicative accessory budget in USD. Sensor / kit, shipping and tax are quoted separately; matching brackets and harnesses require review.

Selected accessory budget $197
3. Request the documents you need

Model-specific documents are subject to configuration and revision review. See document and calibration requirements.

4. Contact and delivery
5. Original-model label, mounting drawing or CAD · optional

PDF, PNG, JPG/JPEG or STEP/STP. Up to 3 files, 5 MiB per file and 8 MiB combined. Include a drawing revision and units when available.

No files selected. You can send a text-only RFQ.

Files are delivered to the SPS inquiry mailbox with your request and are not published by this website. Send only files you are authorized to share. If you use the email link below, attach the files in your email app.

SPS Linear Telemetry uses these details to respond to your request. Privacy policy.

Choose stroke and output to prepare an email.

If your email app truncates a long request, copy the template and paste it into a new message. Files selected here must be attached manually when using your own email app.

Review your request — SPS-SP2-TBD-REVIEW
Hello SPS Linear Telemetry engineering,

Please review this configuration and provide an itemized quotation.
RFQ reference (proposed; not a released part number): SPS-SP2-TBD-REVIEW
Series: SPS-SP2
Nominal stroke requested: To be selected
Sensor signal / meter input requested: To be selected
Termination requested: Please advise
Cable exit review: Confirm against installation drawing
Spring / tension review: Recommend from cable motion and load
Replacing original model: To be advised

Requested accessories:
- 360° multi-axis swivel mounting bracket (indicative +$32)
- Pre-scaled inch/mm readout, peak hold & two relays (indicative +$165)
Selected accessory budget only: $197 USD; sensor/kit, shipping and tax quoted separately.

Requested documents:
- Revision-matched 2D dimensions & mounting drawing
- 3D STEP envelope model
- Electrical specification & connector pinout
- Formal itemized quotation

Name: To be advised
Work / university email: To be advised
Company / university: To be advised
Quantity: To be advised
Delivery country: To be advised
Required date: To be advised
Application / procurement context: Drawing, STEP and calibration scope review

Project requirements:
Please advise.

Please confirm model-specific dimensions, electrical limits, test evidence, document revision and availability in the quotation. This is a configuration review request, not a purchase order.